Abstract: Based on the engineering contract risk analysis, elaborates the three principles of project contract risk allocation.
[摘要]在对工程合同风险进行分析的基础上,阐释了工程合同风险分配的三大原则。
Analysis from the characteristics of EPC conditions of contract, focuses on the risk identification and prevention of the contractor, for the reference of Chinese engineering contracting business.
本文从EPC合同条件自身特点进行分析,重点讨论承包商的风险识别与防范问题,供我国工程承包企业参考。
The process of contract risk management is introduced which includes risk identification, risk analysis and assessment, risk plan, risk monitor and control of contract management.
合同风险管理流程有合同管理风险辨识、合同管理风险分析、合同管理风险规划和合同管理风险监控四个阶段;
应用推荐