The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.
本合同段控制性关键工程是预应力砼连续组合箱梁的施工。
This idea can be used for design of large span continuous beam in strong seismic area.
这种抗震设计思想对高烈度地区的大跨径连续梁桥设计具有现实意义。
This paper is concerned with semi-active control of vertical vibration for continuous beam by variable dampers and puts forward the semi-active control law based on the sliding mode theory.
利用可变阻尼器对连续梁桥的竖向振动进行半主动控制,提出基于滑动模式理论的控制算法,并以实例加以说明。
应用推荐