The exhibition is not the same as the public decoration and home decoration requirements durability, but also do not consider the construction quality problems caused by time and seasonal changes.
展览装修不像公共装修和家庭装修一样要求耐久性,也不太考虑因时间和季节变化所造成的施工质量问题。
The structural strength of the cast-in-place and assembly concrete can change with time. There are corresponding requirements for the concrete strength in different construction stages.
现浇或装配式混凝土结构强度随时间而变化,不同施工阶段对混凝土强度都有相应的要求。
Through aimed construction management the design can meet the requirements and the limit time is shortened, which reduce the construction cost and got good economic benefit.
并通过有针对性地组织施工,使其既能满足设计要求,又能缩短工期、降低施工成本,取得良好的经济效益。
应用推荐