A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.
该方法通过对某一施工延误发生前后网络状态差异的分析,来评定该延误对总工期的影响。
At early time, it infrastructure construction concentrated on it metrics exclusively, such as it service availability, delay, jitter and so on.
早期的IT基础设施建设过程完全以技术标准核心,比如只考虑IT服务的可用性、时延、抖动等方面。
Several design methods and their experimental results are introduced. Design of acoustic cascade is firstly put up, which is effectively used in 1024 bits long delay time SAWTDL construction.
介绍了1024位声表面波抽头延迟线(SAWTDL)的几种设计结构及试验结果。其中声学级联结构为首次提出,是解决高位、长时延SAWTDL设计的行之有效的结构。
应用推荐