... 线路加长器 line lengthener 线路架设 construction of line 线路监视器 line monitor; actual monitor ...
基于42个网页-相关网页
The application of the middle line method of dam construction and the tailing transportation using water isolation pumps are an effective way.
采用大坝中线法施工,采用隔水泵输送尾矿是一种行之有效的方法。
However, the construction of the second Inga-Kinshasa line will be financed by the European Investment Bank (EIB).
第二条因加-金沙萨线路的建设将由欧洲投资银行资助(EIB)。
First, the Federal Energy Regulatory Commission has guaranteed a high rate of return on the construction of the multibilliondollar line, which will be paid for by ratepayers.
首先,美国联邦能源监管委员会已经保证该建设项目将带来高回报,而买单的人就是地方纳税者。
应用推荐