The activities of the TMap Completion phase and its RUP counterparts are shown in Table 6.
TMap完成阶段的活动及其与RUP的对照如表6所示。
Abstract: Project cost control runs through the whole process of engineering construction, the completion phase is a key of control of cost.
摘要]工程竣工阶段是工程建设的最后阶段又是工程最终造价的形成阶段,竣工结算审核是造价控制的关键。
In most cases, subsequent depth measurements, such as those made during the well completion phase, are corrected to the wellhead datum that is based on drillers depth.
在大多数情况下,随后的测量(如在完井阶段所进行的测量)都被校正至基于司钻深度的井口基准面。
应用推荐