... 60% 80% 100% 64% 68% 54% PV AC EV 截止第8周末的包装机项目状况 2 (Schedule Variance-SV): SV = BCWP-BCWS(进度偏差) (进度偏差) [[得出当前进度是提前还是滞后 得出当前进度是提前还是滞后]] SV SV 3、 (Cost Performed Index): CPI是...
基于44个网页-相关网页
It's brought forward an EVM evaluation method with critical path to hold the project progress well through comparing with BCWP and BCWS also with BCWP CP and BCWS CP in critical path at the same time.
本文提出了一种带关键路径的挣值法评价方法,在比较分析BCWP与BCWS的同时对关键路径上的BCWP与BCWS作比较,以便更准确地把握项目进度情况。