Phases consist of multiple iterations — distinct sequences of activities with a base-lined plan and valuation criteria resulting in a release of artifacts (internal or external).
阶段由若干迭代组成——依照基本计划和评价标准的不同序列的活动会致使工件的发布(内部或外部的)。
In terms of basic concept, this paper analyzes the ordinary price quoting means and mode on the base of bill quantity valuation and mark-up valuation.
在基本概念方面,本文分析了基于工程量清单和基于报高率这两种报价基本模型的常见报价方法与报价模型。
In the end, we give out a run-of-mill valuation method on the base of linguistic logic, which can reduce the decision deviation of selecting the numeric scale by error.
最后,基于合理的语言逻辑假设,给出了一种一般性的评价方法,以便于决策者在实际应用中选择适当的数字标度进行决策,降低了由于数字标度选择不当而带来的决策偏差。
应用推荐