When archiving a project, any subproject is also archived. Delete: This is pure deletion of the project.
当归档一个项目时,其所有的子项目也一样被归档。这是一个真正的删除项目操作。
A new idea of online permanent storage based on SAN structure for image files is presented and a Picture Archiving and Communication System (PACS) design project based on SAN structure is discussed.
提出基于SAN结构的影像文件长期在线存储方案,并在此基础上对医学影像存档与传输系统(PACS)的设计进行了论述。
After the project has been completed, but before the design team is reassigned, a project design archiving should be generated.
项目完成后,设计团队分配新任务前,需要对项目的设计进行归档。
应用推荐