RUP USES a master test plan for the overall project and an iteration test plan per iteration.
RUP对整个项目使用一个主测试计划,对每个迭代使用一个迭代测试计划。
These test levels can be coordinated by means of a master test plan (at the project level) and an iteration test plan (at the iteration level).
这些测试级别可以是并列的,这取决于主测试计划(在项目级)和迭代测试计划(在迭代级)。
The master test plan and a detailed planning of test effort should be all that is produced prior to test execution.
主测试计划和测试工作的详细计划,应当是在测试执行之前所产生的所有文档。