此外,我们100 %的质量控制测试,以确保每个单位的机器进行测试之前交付,以维持其零缺陷生产记录。
Also, We perform 100% quality control tests to ensure that every unit of machines is tested before delivery, in order to maintain its ZERO defect production record.
80年代以来,全面质量管理与量化质量成本、全面质量控制、可靠性工程和零缺陷等方法融合,形成了较为系统的全面质量管理体系。
Since the 80's, TQM and, quantification method fusion and quality cost, Total Quality Control, reliability project and zero flaw, have formed the more systematic TQM system.
应用推荐