去年早期Total那儿的计划远远超出它的本钱,它的小组挖的3个井开始变干,于是Total 离开了障碍“al-Khali”。
Total left Rub al-Khali early last year, after its program there ran far over its budget and its teams drilled three wells that came up dry.
首要包罗施工摆设、资本投入方案、施工总平面安插、施工计划、时节施工办法以及工程质量、平安和本钱的节制等。
Include mainly the deployment of resources and inputs plans, construction general layout and construction programs, the construction season as well as project quality, safety and cost control.
对于项目本钱计划的制定,本文以“分解-汇总-分解”的思路,对施工行业的本钱计划制定方法进行回纳。
For the plan of project cost, this thesis took the order of "break down - summary - decomposition" to introduce inductive methods of the cost planning in construction industry.
应用推荐