本文主要阐述了横道网络图的绘制及节点参数的简易计算方法。
This paper states across line network drawing and node parameter facility calculating method.
作为一种先进的方法,网络计划技术在施工管理中应与横道图结合使用,在招投标工作中更应很好地运用。
As an advanced method, the CPM should be combined with the Gantt chart in construction management, and it can be especially well used in tendering.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.