分析阿刀亥选煤厂技改前煤泥水系统存在的主要问题,介绍了技术改造的工艺流程及取得的效果。
The existing problem of coal slurry system before technological reform is presented and the technical process of technological reform and relative effects are introduced in this paper.
介绍了其熔压原理、工艺流程及结构特点,并对设备改造的核心部分液压控制系统的原理进行了详细的说明。
Describes its working principle, process flow and structural characteristics, especially the working principle of its hydraulic control system that is the core in machine reforming.
因此,经过分析工艺要求和生产现状,提出改造方案,改进了煤泥水系统工艺流程。
So that, through analysing process and production conditions, puts the improving plan for slurry thickening system process.
应用推荐