介绍铜湾水电站溢流坝弧形闸门及检修闸门在水上安装前的准备工作及安装方法。
The preparation matters and installation technologies above water for the radial gate and bulkhead gate of Tongwan Hydropower Station are described.
本文在分析溢流表孔弧形工作闸门控制需满足要求的基础上,提出控制系统组成、控制方式的设计以及可实现的控制功能。
Based on the analysis of the control demands of the exterior overfall arc water gate, control system buildup, design of the control mode and the realizable control function are put forward.
应用推荐