深圳地铁一期工程环控制式采用屏蔽门系统。
The environment control system of Shenzhen Metro project phase 1 design USES the Plateform Screen Door system.
主要介绍了深圳地铁一期工程牵引供电系统保护配置及配合关系。
It is mainly introduced the protection configuration and the concerted relationship for the power supply system of Shenzhen metro vehicles at the 1st stage.
百货广场桩基托换工程是深圳地铁一期工程关键工点之一,其托换轴力大,施工环境复杂。
Pile underpinning of Baihuo Plaza with great underpinning force and complex construction environment is one of the important parts of Shenzhen Metro project.
应用推荐