在承包商收到此类附加现场调查的测试、结果和报告后的7天内,应给工程师和雇主所有的副本。
A copy of all such additional site investigations tests, results and reports shall be given to the Engineer and the Employer within 7 days of receipt by the Contractor.
这种形式不利于现场故障白勺快速诊断,很多常用白勺测试功能也需要工程师根据经历判断。
This way is not helpful of network fault diagnosis in sence, the commonly used test function also needs engineer to judge according to the experience.
趋势unipro千兆以太网是一种有效和具有成本效益的测试设计的现场工程师,负责安装和故障排除以太网络。
Trend Unipro GbE is an efficient and cost-effective tester designed for field engineers with responsibility for installing and troubleshooting Ethernet networks.
应用推荐