为防止该矿采矿疏干导致地表大面积塌陷,甚至可能引起附近湖水倒灌矿坑,经多次技术论证后,采用了帷幕注浆堵水方案进行治理。
A curtain grouting blocking technique was used for treating ground collapse and possible lake water entering mine pits due to drainage during mining.
文章主要介绍了该富水溶槽的注浆设计方案、注浆材料及堵水技术。
The paper introduces the grouting technology and grouting materials employed to stop the water ingress from the water contained karst depression.
介绍了水泵房预注浆、堵水的过程及注意事项,并评估注浆效果,提出根治水泵房淋水的方案。
This article introduced the process and notes on advance grouting and blocking against water of pump house.
应用推荐