在大坝确认收到破坏的部位,大都是在较高部位出现裂缝,那里的特点是附设有连接装置,护栏,泄水闸门,警卫室或控制室等。
Where damage has been identified, it has been cracking high in the dam and where additional features such as curbs, railings, gates, or guard or control houses are located.
介绍了PLC在水电厂泄水闸门控制系统中的应用。
The application of the PLC in the automation system of sluices, which are in the hydroelectric plant is introduced.
应用推荐