采用模糊评价法对工程承包风险进行评价,能较好地解决对工程承包风险中各种模糊性因素的度量。
The method of fuzzy evaluation is used to evaluate the project risks in order to solve the extent of fuzzy factors of contracting risks.
在公路工程项目风险评价中,本文基于模糊效用风险度量法提出了模糊效用风险评价法。
In the part of road engineering project risk evaluation, this paper puts forward the method of fuzzy and utility risk evaluation based on the method of fuzzy and utility risk measurement.
砂石料场方案选择中存在着许多难以精确度量的模糊性因素,常规的平衡法、系统分析法很难对此进行有效的处理。
A lot of fuzzy factors exist and are usually difficult to measure in an accuracy way when we select an ideal quarry scheme by using a usual method such as balance method and system analysis method.
应用推荐