本文从误差的传递着手,严密推证了弓高及弦长测量的标准差取不同值时最佳测量点的位置。
Based on the error theory, we strictly deduce where is the optimum measuring point and when the standard error of arch-height and that of chord - length are both defined in this paper.
透过依照“六标准差管理策略”来执行的“气候变迁冲击分析”之协助,合适的减碳活动已经开始起草,且将优先采用最佳方法来解决温室气体的问题。
With the aid of the Climate Impact Analysis, which is aligned to the Six Sigma method, suitable lists of activities are drawn up and optimization methods prioritized.
应用推荐