然后对无锡地区近年来的负荷特性进行了分析,主要对不同年份负荷率、峰谷差、典型行业的日负荷曲线数据进行分析,从中找出无锡地区负荷及负荷特性的特点。
Then it analyses the load characteristics of Wuxi, mainly on load-rate of years and typical daily load data or curves so that we can find the main specialty of the local load.
依据负荷曲线的变化趋势,提出了一种能够细致考虑负荷变化率的日发电计划安排方法。
A daily generation scheduling method which can carefully consider the load variation rate is presented.
机组爬坡率(即机组的升、降负荷能力)是火电机组正常运行的一个重要参数,因此,在编制火电系统日发电计划时必须充分考虑火电机组的爬坡率约束。
Unit ramp rate is a very important parameter for unit running, so it must be seriously concerned when dis-patching unit schedule for thermal power system.
应用推荐