经过定床、动床河工模型试验,优化了整治工程方案。
An optimum regulation scheme is suggested after by the fixed and moveable bed model tests.
进而根据水动力分析以及浅滩成滩特点,提出整治工程方案。
Moreover putting forward the project of renovating engineering on the basis of water power's analysis as well as becoming shallow's characteristic.
通过分析和河工模型试验,提出了兼顾各限制条件的整治工程方案。
In this paper, based on the research both theory analysis and physical model test an optimization alternative of the training works to take account of all limiting conditions is presented.
应用推荐