第五、在地面用膨胀螺栓固定后焊接钢筋做假山的龙骨,然后把钢丝网绑上,再抹灰,然后待其百分之60干度时根据造型刮好。
The fifth, on the ground with expansion bolts fixed welded steel rockeries and keel, then the tie wire, plaster, and the percent of 60 stem degrees according to shape a good scratch.
第二、在地面用膨胀螺栓固定后焊接钢筋做假山的龙骨,然后把钢丝网绑上,再抹灰,然后待其百分之60干度时根据造型刮好。
Second, on the ground made the rockery after expansion bolt welded steel keel, and then tied the wire mesh, plaster, then treat its sixty percent dryness according to sweep.
应用推荐