...搜百科 摘录: 先进超导托卡马克实验装置(Experimental Advanced superconducting tokmak,EAST)。 先进超导托卡马克实验装置,也常称为EAST装置,最简称为EAST。 中国耗时8年、耗资2亿元.
基于2个网页-相关网页
详细地叙述了求解真空室上感应涡流的计算方法,对HTU托卡马克实验装置真空室上涡流的大小、分布形式及衰减情况进行了分析。
The numerical method of calculating these eddy currents is presented in detail. The magnitude, distribution and decay of the eddy currents on the vessel of the HTU tokamak are analysed.
文章介绍HT - 7托卡马克实验装置上的中性束诊断电源系统的组成、结构,以及基于S7 - 300 PLC的逻辑控制系统。
A power supply system for diagnostic neutral beam on the HT-7 Tokamak was developed. Its logic control system based on S7-300 PLC was described.
本文介绍了中科院等离子体所ht - 6m托卡马克装置新的控制系统的设计方法、工程实现及实验运行结果。
The design, realization and experiment result of new control system of HT-6M tokamak based PC real time control have been described.
应用推荐