由此引发的工程索赔的金额非常巨大,如何索赔与反索赔成为工程建设中的新课题。
Therefore, how to claim and anti-claim becomes a new problem for engineering constructions. This paper made some preliminary analysis on the claims only caused by geological hazards.
图4所示的情节串连图板说明这些参与者如何围绕损害索赔进行协作。
The simple storyboard in Figure 4 shows how these actors collaborate on the damage claim.
下一小节将检查初始索赔表单,并解释如何在那个表单上直接嵌入点击呼叫功能。
The next section looks at the initial claim creation form, and explains how to embed click-to-call capabilities directly on that form.
应用推荐