介绍了邢台兴华煤矿井筒冻结施工工程设计及冻结失败原因分析。
The engineering design of freeze sinking in shaft of Xinghua Coal Mine is introduced and the causes for its failure are analyzed.
回顾会议就是浪费时间,并不能帮助改善流程,我们想取消这些会议—— 团队需要分析回顾会议失败的原因。
Retrospective meetings are waste, they do not help in process improvement and we want to remove them – The team should analyse the reasons for failed retrospectives.
这是合理的,因为管理员可能希望分析过程的失败原因,甚至重新启动失败的过程实例。
This is reasonable because administrators might want to analyze process failures or even restart the failed process instances.
应用推荐