混凝土的收缩徐变和车辆超载是大跨度连续梁桥主梁下挠严重的主要因素之一。
The creep is the main reasons why the deflection of the girder is larger than that of code.
本文以杭州湾跨海大桥北航道非通航孔桥为工程背景,对大跨度预应力混凝土箱梁锚固区混凝土的应力应变分布特征进行了分析研究。
A study of the stress and strain distribution of anchorage zone in a long span PC box girder was undertaken in the background of Hangzhou Bay Bridge project.
介绍大跨度不对称曲线预应力混凝土连续梁桥的设计和成桥后的静、动载试验。
In this paper, the design of the long span asymmetric prestressed concrete curved continuous girder bridge, and static and dynamic load tests for the completed bridge are described.
应用推荐