很难获得土建工程合同的相关信息,纳税人不能监测合同执行进度,无法确定合同是否按预算执行。
Information on contracts for civil works was not easily available and did not allow taxpayers to monitor implementation of these contracts and see if they were carried out as budgeted.
二滩水电站土建工程国际合同文本实施已近7年,实践证明它是较好的合同样本。
It is proved that the international contract of civil engineering construction for Ertan Hydropower Station is a good model since it has practiced for about 7 years.
从楼层下方向上方安装,能够和土建配合同步施工,有利于缩短整体建筑施工周期。
The plates can be installed from lower floors to upper floors. Installation can be simultaneously carried out with civil engineering, which is conducive to shorten the overall construction cycle.
应用推荐