理顺围垦工程内部的管理机制等措施。
Rationalize the administration mechanism enclosing inside of project for cultivation waiting for measure.
而从1934年到漩门二期围垦工程后,纳潮量减小了22.57%。
In fact, after this reclamation project, the tidal influx has reduced 22.57 % since 1934.
疏浚机周围悬浮物的含量以及围垦工程溢流的排放可提供关于溢出率的信息。
The content of suspended matter around the dredger and the dis "-charge of the overflow from reclamation give information about the spill rate."
应用推荐