该测试的完成使商业宽带卫星计划(CBSP)的单位级别转换(ulv)进入初期生产阶段。
Completion of the testing moves the Commercial Broadband Satellite Program (CBSP) Unit Level Variant (ULV) contract into the initial production phase.
在设计程序的另一端,最后的程序是初期生产,可能是试生产或者日常生产的开始。
At the opposite end of the design program, the last event is initial production which may be pilot production or the beginning of routine production.
一个设计的目的是为了解决特定的问题,初期生产阶段的设计样品原型代表初期的解决方案。
The intention of design is to solve a specific problem. Models from the early production phase represent an initial solution.
应用推荐