(3)初始预算阶段(Initial Budgeting Phase) 首先将top.ngc作为Ngdbuild命令的输入,生成top.ngd 文件,然后使用Floorplanner对其进行位置和面积约束,产 生约束文件top....
基于16个网页-相关网页
不仅仅是具有高效的初始和细化阶段从而将更多的预算留给系统的测试,但是在构建一个健壮的系统上我们的设计是更加成功的。
Not only did having efficient inception and elaboration phases leave more budget for testing the system, but our design succeeded better at building a robust system.
预算本钱由项目初始阶段的具体成本估算得来。
The budgeted cost is derived from the detailed cost estimate prepared at the start of the project.
应用推荐