意识这一点使人们了解到,通过增加面向对等伙伴关系的一致性的分级或分层,可以取得可能最好的互操作性。
Recognizing this results in a realization that interoperability is likely best achieved through increased staging, or leveling, of conformance toward peer-to-peer partner relationships.
项目的分级是这样的,及格分数为50%和70% +表示区分层次的工作。
The grading of projects is such that the pass mark is 50 per cent and 70 per cent + indicates distinction level work.
本文提出了一种分段、分层、分级的递进优化方法,应用于汽油机工作过程的优化计算中,取得了较好的效果。
A segmented, layered and graded progressive optimization technique is introduced for the calculation in this paper and satisfying results are achieved.
应用推荐