本文在分析设计阶段造价管理存在问题的基础上,就如何加强工程项目设计阶段的造价管理与控制提出了几点建议。
Based on the analysis of the problems of the design phase cost management, some Suggestions are put forward about how to strengthen the cost management and control of the project design phase.
在系统分析设计阶段,对教学计划管理、学籍管理、教师管理、教材管理、选课管理和排课管理几个模块进行了分析。
In the system analysis section, several modules such as teaching project module, student status management, teacher management, textbook management, course-selecting management are are analysed.
本文提供了一些SOA架构技巧以用于从业务工件包中发现错误处理的需求以及在整个SOA分析和设计阶段如何分析这些需求。
This paper provides SOA architects techniques to discover error handling requirements from the business artifacts package and how to analyze these while going through SOA analysis and design phase.
应用推荐