译网情深 - 打印文章 - ... cut-off switch 切断开关; 断流开关; 断路接触器 cut-off test 停车试验 cut-off time 截止时间 ...
基于94个网页-相关网页
在2年末时,布尔萨将准备在停车场进行试验,他认为停车场是进行LED光源和发电系统试验的绝佳试验场。
At the end of those two years, Brusaw would like to be ready for testing in parking lots, which he sees as the perfect proving grounds for the lights and the power-generation system.
去年12月,美国北卡罗来纳州的罗利市将一处室内公共停车场当作LED的试验场地(下面两张照片是前后对比效果)。
Last December Raleigh, N.C., turned one floor of a municipal parking garage into a testing ground for LEDs (see the before-and-after photos at cree.com/LEDcity).
仿真试验表明,所得结果优于经典方法,降低了交叉口的总延误时间和停车次数,提高了通行能力。
Simulation experiments show that the results can be better than that of classical (methods), and can reduce total delay and stops and improve traffic capacity at intersections.
应用推荐