分析了中国实验快堆事故停堆后余热的排放过程。
This paper analyzes the process of decay heat removal after Chinese Experimental Fast Reactor (CEFR) scram.
结合研究情况,初步给出了中国实验快堆非能动系统可靠性研究方法。
The passive system reliability is demanded to go deep into research. Combining with the current research, reliability of residual heat removal system of passive systems in CEFR is preliminary formed.
中国实验快堆实现满功率稳定运行72小时,标志着已经掌握快堆关键技术。
The China Experimental fast reactor (CEFR) has achieved full power operation over 72 hours, signifying that China has already mastered the core technology associated with fast reactors.
应用推荐