... inclined cut and fill stoping 倾斜分层充填法 overhand cut and fill stoping 上向分层充填法 vertical cut and fill stoping 垂直分条充填法 ...
基于16个网页-相关网页
先房后柱的上向分层胶结充填法在我国应用较为广泛,但矿柱后期回采条件较差。
The practice cf mining room first and then pillars by overhand cut and cemented fill is widely used in China, but the condition for pillars recovery in later period is normally worse.
推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。
The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.
为此,试验用盘区上向分层干式充填采矿法进行回采,取得了较好的效果。
As viewed form this, the panel upward horizontal cut-and dry filling method has been tried to use for this orebody mining, with a better results.
应用推荐