Riskmodellingofelectric forward contractsandstrategies of electric contracts transaction under power market based onPOOL operation are mainlystudiedin this paper.
The telltale sign of trouble at reactor No. 2, Tokyo ElectricPower Co. officials said, was that pressure had dropped in the "suppression pool" the part of the reactor that converts steam to water at the bottom of the container.