It is absolutely imperative that any change to the scope of the project have a matching change in budget, either time or resources.
任何项目范围的改动肯定会不可避免地带来相应预算的改变,无论是时间还是资源。
Either the Exposed Router Run-time pattern (Figure 12), or the Exposed Enterprise Service Bus (ESB) pattern (Figure 13), support that requirement (see Resources).
公开路由器运行时模式(图12)或公开企业服务总线(esb)模式(图13)能够满足那种需求(详见参考资料)。
应用推荐