Double vault tunnel 双连拱隧道 收藏 Double Arched Tunnel 连拱隧道 收藏 Piston Wind Velocity in Tunnel with Double Shafts 双竖井活塞风 收藏 .
基于1个网页-相关网页
During the construction of double-arched tunnel, the role of center pillar is of great importance.
在连拱隧道施工中,中隔墙扮演着至关重要的角色。
Seepage water treatment of mid-partition wall in double-arched tunnel in expressway;
提出了按拱结构计算双连拱隧道中隔墙的荷载。
From the computing results, this paper evaluates the excavating, and gives some opinions on excavating procedure of double-arched tunnel.
根据计算结果来评价开挖工序的优劣,对连拱隧道的开挖过程提出一些建议。
应用推荐