Power Line Disturbance Test 电源干扰测试 ; 输入电源扰动测试
telephone disturbance test [通信] 电话干扰试验
circuit disturbance test 电路干扰试验
load disturbance test 负载扰动试验
large-disturbance test 大扰动试验
Power Disturbance Test 功率辐射测试
large disturbance test 大扰动试验
no-load disturbance test 空载扰动试验
non-loaded disturbance test 空载扰动试验
·2,447,543篇论文数据,部分数据来源于NoteExpress
Load disturbance test and AGC test were carried out during test operation.
在试运期间进行了负荷扰动试验和电网AGC试验。
The electrical fast transient (EFT) disturbance test is one of the most difficult tests, because it is a fast uprising, repetitive pulse group.
介绍了电能表在进行电快速瞬变脉冲群(eft)抗扰度试验时的一种脉冲个数测量方法。
According to GB 9254 — 2008, common mode disturbance test of telecommunication port is to measure the conducted electrical field of ITE transmitted into network.
按照GB 9254—2008,电信端口传导共模骚扰测试反映的是信息技术设备(ite)通过电信端口向通信网络反向注入的传导场强。
应用推荐