The dissipation of excess pore water pressure has a direct bearing on the design of pile foundation in saturated soft soil.
饱和软土地基中桩基设计与沉桩引起的超孔隙水压力大小及其消散有密切关系。
Loading rate effect, creep and stress relaxation should be attributed to the viscous properties of the sand specimens, but not to the delayed dissipation of excess pore water pressure.
加载速率效应、蠕变以及应力松弛都是砂土材料本身黏性的反映,而与超孔隙水压力的消散无关。
The process of accumulation and dissipation of extra-static pore water pressure in fine-grained mud layer of tailings fill dam constructed by up-stream method is analysed.
本文对上游法修筑的尾矿坝的细粒泥层内超静孔隙水压力的积累和消散过程进行了分析。
应用推荐