3.根据生产环境的特点,可将调度问题分为确定性调度(Deterministic Scheduling)16]题和随机性调度(StochasticScheduling)I'口]题。 4.根据作业的加工特点,可将调度问题分为静态调度和动态调度。
基于28个网页-相关网页
The former is characterized by the ability to know requirements with surety in advance, thereby making deterministic scheduling possible.
前者的特征是确保具有提前了解需求的能力,因而可以制订确定性计划。
To schedule deterministic pauses for GC, Metronome USES two different threads to achieve both consistent scheduling and short, uninterrupted pause times.
为了给GC调度确定性暂停,Metronome使用了以下两个不同的线程来完成一致性调度和短暂连续的暂停时间。
In this paper, the deterministic model of cascaded hydropower station optimal scheduling is compared with the stochastic model, and the deterministic model is mainly researched.
文中比较了梯级水电优化调度的确定性模型和随机模型,并着重探讨了确定性模型。
应用推荐