On the other side, late in the project, you often want to introduce more control, such as change control boards, to remove undesired creativity and associated risk for late introduction of defects.
另一方面,在项目后期,你往往想要引入更多控制,比如变更控制板,来消除不想要的创造性和相关风险,以免在晚期引入缺陷。