Windows and insulation came next, and then prefabricated bathrooms and kitchen modules were installed. Finally the unit was lifted by crane into position on the building.
下一步是生产窗和隔热层,之后是安装预制浴室和厨房模块,最后这个单元被起重机吊起来放置在这座建筑的相应位置上。
To maximize the useable area of the narrow lot, the exterior walls were assembled and waterproofing installed horizontally on site and then tilted into position along the property lines with a crane.
为了最大化利用狭窄地段的可用面积,外墙和水平防水屋顶都在基地进行组装,然后用起重机沿着地块线倾斜到适当位置。
To walk after fixed tower crane should remain on track, such as fixed position in backfill soil, the foundation for special treatment, must meet the load requirements.
先行走后固定塔吊应立于轨道上,如后固定位置处于回填土上时,其基础作特殊处理,必须满足承载要求。
应用推荐