cost estimate number 成本估算号码 cost estimate plant 评估工厂 cost estimate with period-based transfer control 根据基于期间的转移控制的成本估算 ..
基于2个网页-相关网页
In the plant from which the material component is withdrawn according to the special procurement type, the system looks for existing costing data and transfers that data into the cost estimate.
在依照特殊的获取类型指定的物料部件被提取的工厂,系统搜索已经存在的成本数据并传送这些数据到成本核算中。
That is at least double what a coal-burning power plant would cost, and Mr. Romm said that it was only the preconstruction estimate of an industry famous for cost overruns.
这是说,至少有一倍一座燃煤电厂的成本,罗姆先生说这只是一个著名的行业的预先成本超支现象。
应用推荐