The installation and construction of BAS is a construction project with advanced technology, wide realm and large investment, its construction quality relates directly to the normal operation of BAS.
建筑设备监控系统(BAS)安装施工是一项技术先进、涉及领域广、投资规模大的建设项目,其施工质量直接关系到楼宇设备自动化系统的正常运行。
In depth study of high-rise building hydropower installation and construction technology is an inevitable choice to enhance the level of high-rise building construction.
深入研究高层建筑水电安装施工技术是提升高层建筑施工水平的必然选择。
Its installation means USES stickup formula, construction technology is more sophisticated, taller also to the flatness requirement of the ground.
它的安装方式采用粘贴式,施工工艺比较复杂,对地面的平整度要求也较高。
应用推荐