... Channel Condition 航道条件 channel conservancy 航道保? Channel Construction 航道设施 ...
基于32个网页-相关网页
·2,447,543篇论文数据,部分数据来源于NoteExpress
On the basis of the Conclusion of safety certification, being directed against the project questions, the dam widen, spillway rebuild, irrigation conservancy and channel rebuild have been adopted.
以水库安全鉴定主要结论为基础,针对工程中实际存在的问题,采取了相应的大坝加宽、溢洪道改建、灌溉输水涵管补漏及东西灌渠的改建等除险加固设计。
youdao
应用推荐
模块上移
模块下移
不移动