In office calculation of closed traverse, the Angle of connection is not corrected, because there is no check condition.
在闭合导线内业计算中,由于连接角没有检核条件,因而对连接角未进行改正。
The article studies the sub-hydraulic lifting scaffold in high-rise building design, calculation and application, and to pay for a flight in the Office building Project as an example to elaborate.
本文主要研究了分体液压升降爬架在高层建筑工程中的设计、计算与应用,并以中交一航局办公大楼工程为例进行阐述。
Introduced the method for analysis and calculation of coaction between raft foundation, piles and ground for an expressway office, it is useful for reference of the same project.
介绍某高速公路管理处考虑筏板-桩-地基共同作用的分析与计算方法,以供类似工程参考。
应用推荐