The simulative labeling yield was tested by UV-spectrophotometer and calculated as 80.4%.
采用紫外分光光度计测试吸光度并计算出模拟标记率达80.4%。
The one key difference is that notes or bonds that go to maturity always mature to par, so the yield is calculated with that in mind.
一个关键的区别是,到成熟总是成熟的标准,票据或债券,因此产量计算考虑到这一点。
In this research, soil erosion and sediment yield was calculated by runoff shear stress, runoff energy consumption and runoff power theory respectively.
分别利用坡面径流剪切力、坡面径流能耗和坡面径流单位水流功率理论对坡面土壤侵蚀发生过程进行了研究。
应用推荐